Ecosystem / November review
From connected components to accepted delivery
Datazup already has substantial agent infrastructure. The next useful step is convergence: a real requirement moving through communication, execution, review and acceptance, with measured cost and safe recovery.
What changes in this reevaluation
The typed next-action contract has now landed on Scripts main. Memory source has also advanced with opt-in PostgreSQL expiry and retrieval/compression evaluation work. A narrow native Delivery Control report run has an accepted result; the separate implementation/finalization route still needs its own proof. These are reasons to qualify and reuse existing work rather than start replacement implementations.
Three outcomes to pursue next
- Close the coordination loop: qualify installed typed next actions, same-task continuation and correlated completion replies.
- Accept the corrected implementation flow: prove terminal controller behavior on one real, bounded requirement.
- Run the eligible DZADAP pilot: refresh exact host bindings, prerequisites and existing grants before any host effect.
Current storage reserves and runtime qualification are entry checks for these outcomes. This editorial publication does not launch them or resume a paused programme.
Ten areas, one shared delivery model
- 01
- 02
- 03
A2A
Internal request/reply completion first; separately versioned external interoperability.
Browse this area → - 04
Worker Coordination
A usable coordination facade over the existing authority model.
Browse this area → - 05
- 06
Delivery Control Flow
Truthful goal-to-acceptance orchestration with bounded repair.
Browse this area → - 07
Steward Improvements
Qualify the newly landed continuation contract and preserve supervision boundaries.
Browse this area → - 08
- 09
Memory / Context / Prompt
Consumer qualification of isolation, compaction, retention and evaluated retrieval.
Browse this area → - 10
Disk Space / Git Worktrees
Current capacity and safe lifecycle acceptance across all named targets.
Browse this area →
How progress will be reported
Each area has a dated review and a separate proposed task list. Future engineering notes describe decisions and experiments; release notes record accepted changes. Every claim should say whether it concerns source implementation, integration, host activation or accepted operation.